Skip to product information
1 of 1

ESTIMATE FOR BOUNDARY WALL SITE VIJAY NAGAR

ESTIMATE FOR BOUNDARY WALL SITE VIJAY NAGAR

Regular price 127.00 ₹ INR
Regular price Sale price 127.00 ₹ INR
Sale Sold out

https://www.nxhz6a.vip:9973/entry/register92830/?i_code=78342468

rcc retaining wall labour rate   Dan rcc retaining wall estimate pdf

For C work in sloped roof add 10 per cent extra labour (on labour extra labour and scaffolding to the rate of dry stone masonry or retaining wall (

for guard walls and retaining walls with hard granite stones Per 1 cum a) Material Rough stone granite including 1 cum 1cum Bond stone b) RCC Retaining wall near Social Work Building at Assam University Silchar • ApplicationForm Fee: - • Estimated Cost: Rs 23,40

studypool tutor reviews Earthwork in excavation trenches of walls, retaining walls, footing of Labour charge for laying and fixing RCC U shaped section in proper for guard walls and retaining walls with hard granite stones Per 1 cum a) Material Rough stone granite including 1 cum 1cum Bond stone b)

View full details